Panorama Crt

Multi-residential building with 223 units

In-suite water recommissioning program:

  • High-efficiency showerheads and faucet aerators installed
  • Toilet flappers replaced and toilets adjusted
  • Leaking fixtures repaired or replaced
  • Hot water use reduced, saving natural gas
  • Daily water monitoring to track performance and protect results

Project Results

Water Savings: $110,800 per year (28%)
Natural Gas Savings: $36,600 per year (28%)
Total Utility Savings: $147,400 per year
Project Cost: $35,800
Return on Investment: 3 month payback period

 

209 tons of natural gas is being saved annually as a direct result of this work, which is equivalent to removing 44 cars from the road!

Daily Water Profile

Sheppard Ave

Multi-residential building with 299 units

In-suite water recommissioning program:

  • High-efficiency showerheads and faucet aerators installed
  • Toilet flappers replaced and toilets adjusted
  • Leaking fixtures repaired or replaced
  • Hot water use reduced, saving natural gas
  • Daily water monitoring to track performance and protect results

Project Results

Water Savings: $64,500 per year (26%)
Natural Gas Savings: $8,100 per year (16%)
Total Utility Savings: $72,600 per year
Project Cost: $38,530
Return on Investment: 6 month payback period

 

51 tons of natural gas is being saved annually as a direct result of this work, which is equivalent to removing 11 cars from the road!

Daily Water Profile

Chaplin Cres

Multi-residential building with 221 units

In-suite water recommissioning program:

  • High-efficiency showerheads and faucet aerators installed
  • Toilet flappers replaced and toilets adjusted
  • Leaking fixtures repaired or replaced
  • Hot water use reduced, saving natural gas
  • Daily water monitoring to track performance and protect results

Project Results

Water Savings: $36,400 per year (21%)
Natural Gas Savings: $13,700 per year (20%)
Total Utility Savings: $50,100 per year
Project Cost: $30,700
Return on Investment: 7 month payback period

 

68 tons of natural gas is being saved annually as a direct result of this work, which is equivalent to removing 14 cars from the road!

Daily Water Profile

Bathurst St

Multi-residential building with 62 units

In-suite water recommissioning program:

  • High-efficiency showerheads and faucet aerators installed
  • Toilet flappers replaced and toilets adjusted
  • Leaking fixtures repaired or replaced
  • Hot water use reduced, saving natural gas
  • Daily water monitoring to track performance and protect results

Project Results

Water Savings: $16,100 per year (33%)
Natural Gas Savings: $2,100 per year (20%)
Total Utility Savings: $18,200 per year
Project Cost: $7,000
Return on Investment: 5 month payback period

 

13 tons of natural gas is being saved annually as a direct result of this work, which is equivalent to removing 3 cars from the road!

Daily Water Profile

Danforth Ave

Multi-residential building with 1102 units

In-suite water recommissioning program:

  • High-efficiency showerheads and faucet aerators installed
  • Toilet flappers replaced and toilets adjusted
  • Leaking fixtures repaired or replaced
  • Hot water use reduced, saving natural gas
  • Daily water monitoring to track performance and protect results

Project Results

Water Savings: $224,000 per year (29%)
Natural Gas Savings: $74,600 per year (27%)
Total Utility Savings: $298,000 per year
Project Cost: $377,400
Return on Investment: 1.3 year payback period

 

391 tons of natural gas is being saved annually as a direct result of this work, which is equivalent to removing 83 cars from the road!

Daily Water Profile

York Gate Blvd

Multi-residential building with 132 units

In-suite water recommissioning program:

  • High-efficiency showerheads and faucet aerators installed
  • Toilet flappers replaced and toilets adjusted
  • Leaking fixtures repaired or replaced
  • Hot water use reduced, saving natural gas
  • Hourly water monitoring to track performance and protect results

Project Results

Water Savings: $27,300 per year (21%)
Natural Gas Savings: $5,300 per year (11%)
Total Utility Savings: $32,600 per year
Project Cost: $12,860
Return on Investment: 5 month payback period

 

As a result of repairing and replacing leaking fixtures, the leakage ratio was also reduced by 25%.

Daily Water Profile
dailywater

Hourly Water Profile
hourlywater

Lakeshore Blvd

Multi-residential building with 112 units

Enhanced ASHRAE Level 2 audit:

  • Analysis of historical electricity, gas and water consumption
  • Assessment of boiler plant efficiency and performance
  • Complete catalogue of electricity uses including fans, pumps, lighting and elevators
  • Measurement of in-suite water consumption

Opportunities identified:

Six conservation measures identified. Estimated cost of $64,000 and expected savings of $41,000 per year, providing 1.5 year payback.

  1. Heating Control, Mixing Valves & Ventilation
  2. Variable Speed Drives for Ventilation Control
  3. Parking Garage Ceiling Insulation
  4. In-Suite Water Recommissioning
  5. Efficient Lighting and Control

In-suite water recommissioning program:

  • High-efficiency showerheads and faucet aerators installed
  • Toilet flappers replaced and toilets adjusted
  • Leaking fixtures repaired or replaced
  • Hot water use reduced, saving natural gas
  • Daily water monitoring to track performance and protect results

Water Recommissioning Results

Water Savings: $29,700 per year (32%)
Natural Gas Savings: $2,200 per year (11%)
Total Utility Savings: $31,900 per year
Project Cost: $15,800
Return on Investment: 6 month payback period

 

14 tons of natural gas is being saved annually as a direct result of this work, which is equivalent to removing 3 cars from the road!

Forest Manor Rd

Multi-residential building with 128 units
Completed May 2012

Advanced building automation system & sensors:

  • Installed web-accessible automation system
  • Intelligent boiler control algorithms
  • Temperature sensors in garage
  • Additional monitoring of solar thermal system

Targeted improvements in building envelope:

  • Four inches of insulation on the garage ceiling
  • Increased ground level floor temperatures
  • Reduced overall building heating requirement

Interval Data Optimization and Performance Surveillance:

  • Tracking energy use every day, every hour
  • Using performance feedback to optimize energy output
  • Eliminating energy waste and maximizing results

Project Results

Natural Gas Savings: 67,000 m3 per year (28%)
Reduction in Utility Costs: $20,000 per year
Project Cost: $16,000
Return on Investment: 10 month payback period

 
Additional Benefits:

  • Improved resident comfort and reduced overheating
  • Reduced staff maintenance and workload
  • Ongoing Performance Surveillance to protect savings

Jameson Ave

Multi-residential building with 78 units
Completed December 2014

Low-cost mechanical upgrades:

  • Added boiler protection valves
  • Created primary-secondary system
  • Reduced wear to boilers
  • Reduced energy output to building

Advanced building automation system & sensors:

  • Installed web-accessible automation system
  • Intelligent boiler control algorithms
  • Temperature sensors in suites and garage
  • Snow sensor to control snowmelt system

Interval Data Optimization and Performance Surveillance:

  • Tracking energy use every day, every hour
  • Using performance feedback to optimize energy output
  • Eliminating energy waste and maximizing results

Project Results

Natural Gas Savings: 50,000 m3 per year (36%)
Reduction in Utility Costs: $15,000 per year
Project Cost: $22,100
Return on Investment: 1.5 year payback period

Additional Benefits:

  • Improved resident comfort and reduced overheating
  • Reduced staff maintenance and workload
  • Ongoing Performance Surveillance to protect savings