Case Studies

York Gate Blvd

Multi-residential building with 132 units

In-suite water recommissioning program:

  • High-efficiency showerheads and faucet aerators installed
  • Toilet flappers replaced and toilets adjusted
  • Leaking fixtures repaired or replaced
  • Hot water use reduced, saving natural gas
  • Hourly water monitoring to track performance and protect results

Project Results

Water Savings: $27,300 per year (21%)
Natural Gas Savings: $5,300 per year (11%)
Total Utility Savings: $32,600 per year
Project Cost: $12,860
Return on Investment: 5 month payback period

 

As a result of repairing and replacing leaking fixtures, the leakage ratio was also reduced by 25%.

Daily Water Profile
dailywater

Hourly Water Profile
hourlywater

Case Study PDF DOWNLOAD