Case Studies

Sheppard Ave

Multi-residential building with 299 units

In-suite water recommissioning program:

  • High-efficiency showerheads and faucet aerators installed
  • Toilet flappers replaced and toilets adjusted
  • Leaking fixtures repaired or replaced
  • Hot water use reduced, saving natural gas
  • Daily water monitoring to track performance and protect results

Project Results

Water Savings: $64,500 per year (26%)
Natural Gas Savings: $8,100 per year (16%)
Total Utility Savings: $72,600 per year
Project Cost: $38,530
Return on Investment: 6 month payback period

 

51 tons of natural gas is being saved annually as a direct result of this work, which is equivalent to removing 11 cars from the road!

Daily Water Profile

Case Study PDF DOWNLOAD


Project Results